#7 - Under construction (II)
Second tour through the construction of the new building of Tabakalera.
Amaya El Busto, architect and manager of the relationship among the architectural and cultural project, shows us the most active areas during these last weeks. Throughout its more than 36,200 square meters, Amaya makes a list of possible listening exercises that she finds in the construction process, both through increasingly advanced acoustic adaptation of the spaces of the building, as well as through descriptions, stories or brief meetings with workers.
This sound piece also includes recordings of vibratory phenomena of the structure of the building, collected during the same period of time than the interview.
25 min. : soinua ; 49 MB ; MP3
http://www.tabakalera.eu/es/proiektuak/7-en-construccion-ii/Basque

Authors : Xabier Erkizia
Tags : Tabakalera building, Rehabilitation, Architecture, Sound, Xabier Erkizia, Arkitektura belarriz, Podcast